TRAINING TECHNICAL DRAWING PIPING & INSTRUMENTATION DESIGN

TRAINING TECHNICAL DRAWING PIPING & INSTRUMENTATION DESIGN

Training Gambar Teknis Perpipaan & Desain Instrumentasi

Training Equipment Identification

training gambar teknis perpipaan & desain instrumentasi murah

PURPOSE
* Understand process control devices and the symbols used to define them
* Define and specify vendor criteria for the production of plant documentation to the order of the company
* Be familiar with the use of specifications to control the design scope of the project
* Understand the purpose of a HAZOP in the development of a plant
* Be in a position to implement and manage plant modifications from conception to completion
* Be aware of the ISA standard available to assist you in developing and understanding instrument and control documents

PARTICIPANTS

Instrumentation and Control Engineers & Technicians, Electrical Engineers, ,Project Engineers, Telecommunications Engineers & Technicians, Process Control Engineers, Consulting Engineers, Maintenance Engineers & Technicians, Production Controllers, Project Managers, Electricians,

COURSE OUTLINE

INTRODUCTION
* Standards and Regulations (ANSI, ASME, ASTM, API, CSA, ISA, OSHA)
* Drawings in Project Lifecycle
* Document Control

PIPING AND INSTRUMENTATION DIAGRAMS
* Piping and Instrumentation Diagram (P&ID)
* P&ID Symbols
* Line Numbering  ; Valve Numbering
* Equipment Identification
* Abbreviations

INTERPRETING P&IDs – VALVES
* Valve Types  ;  Valve Identification;  Valve Fittings

INTERPRETING P&IDs – EQUIPMENT
* Vessels  ; Pumps  ; Heat Exchangers
* Compressors
* Equipment Identification

INTERPRETING P&IDs – CONTROL & SAFETY SYSTEMS
* Distributed Control Systems (DCS)
* Safety Instrument System (SIS)
* Instrument Symbols
* Instrument Signal Lines
* Pressure Instruments
* Temperature Instruments
* Flow Instruments

DETAILED ENGINEERING DRAWINGS
* Plot Plan
* Electrical Area Classification
* Piping Drawing
* Isometric
* Material Take Off
* Line List  ; Tie-in List
* Shutdown Key

ENGINEERING DRAWINGS FOR CONSTRUCTION AND OPERATION
* Developing As-Builds
* Preparing for a PHA (HAZOP, What-If, etc)
* Management of Change (MOC)

TRAINING METHOD
* Presentation
* Discussion
* Case Study
* Evaluation

Instructor by :

DR. Ir. Halim Abdurachim

Jadwal training technical drawing piping & instrumentation design

Jadwal Portal Cari Training 2026

 

  • batch 1 : 7–18 Jan 2026 | 14–15 Jan 2026 | 21–22 Jan 2026 | 28–29 Jan 2026
  • batch 2 : 4–15 Feb 2026 | 11–12 Feb 2026 | 18–19 Feb 2026 | 25 –26 Feb 2026
  • batch 3 : 4–5 Mar 2026 | 11–12 Mar 2026 | 25–26 Mar 2026
  • batch 4 : 6–7 Apr 2026 | 14–15 Apr 2026 | 21–22 Apr 2026 | 28–29 Apr 2026
  • batch 5 : 6–7 Mei 2026 | 12–13 Mei 2026 | 20–21 Mei 2026 | 25–26 Mei 2026
  • batch 6 : 2–3 Jun 2026 | 10–11 Jun 2026 | 17–18 Jun 2026 | 24–25 Jun 2026
  • batch 7 : 8–9 Jul 2026 | 15–16 Jul 2026 | 22–23 Jul 2026 | 29–30 Jul 2026
  • batch 8 : 5–6 Aug 2026 | 12–13 Aug 2026 | 18–19 Aug 2026 | 26–27 Aug 2026
  • batch 9 : 2–3 Sep 2026 | 9–10 Sep 2026 | 16–17 Sep 2026 | 23–24 Sep 2026
  • batch 10 : 7–18 Okt 2026 | 14–15 Okt 2026 | 21–22 Okt 2026 | 28–29 Okt 2026
  • batch 11 : 4–5 Nov 2026 | 11–12 Nov 2026 | 18–19 Nov 2026 | 25–26 Nov 202
  • batch 12 : 2–3 Des 2026 | 9–10 Des 2026 | 29–30 Des 2026

Investasi dan Lokaspelatihan:

  • Yogyakarta
  • Jakarta
  • Bandung
  • Bali
  • Surabaya
  • Lombok

Catatan : Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Fasilitas :

  • FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara/Stasiun/Terminal)
  • Module / Handout
  • Flashdisk
  • Sertifikat
  • FREE Bag or bagpackers (Tas Training)
  • Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
  • 2xCoffe Break & 1 Lunch, Dinner
  • FREE Souvenir Exclusive
  • Training room full AC and Multimedia

Kontak Kami

Pelatihan Terbaru