Drilling and well construction (probably one of the most expensive features of a geothermal direct use project) is often the least understood. This training will provides the basics of Equipment and methods used for drilling and completion of geothermal wells. It provides data needed by architects, engineers, and consultants to assist them in specification writing, selection of contractors, and drilling and completion inspection.

Most direct use geothermal wells can be drilled using conventional water well technology and equipment. Most of the wells will produce water at temperatures less than boiling and without artesian flow at the surface; however, some will be hotter or will flow. Blowout preventers and other sophisticated safety equipment are not usually required; however, this does not mean that there are not significant Safety considerations that should be addressed. Many of the wells have water above 140 0 F and this will scald. Public and drilling crew safety must be ensured. The cementing portion may appear to be overly detailed and long. However, the author’s view is that, all too often, Cementing is considered simply as a means of plugging up the annulus between the casing and borehole wall. Little attention is paid to methods and materials, and a poor cement job is the result. This can result in lost production zones, cold water leaking into production zones, geothermal water leaking into freshwater zones, and reduced useful well life. Also, in view of the increasing awareness and concern about inter-zonal Migration and possible fresh water aquifer contamination, proper cementing is of increasing importance.

COURSE OUTLINE

Drilling Equipment

Cable Tool
Rotary Drilling
Other Thypes of rotator drilling
Downhole harmer
Reverse circulation
Drill through casing driver
Dual tube reverse circulation
4.Core Drilling

5. Directional Drilling

Drilling Fluids

Long Circulation
Drilling Muds
Density
Viscosity
Sand content
Filter cake
Gelling
Lost circulation materials
Recognizing geothermal zones
3. Polymer fluids

4. Air based Fluids

5. Plumbness and Alignment

Well Design

Casing Materials

Grouting and Cementing

Blow out Prevention Equipment

Injection wells

Well Specifications

BID sheets

Well Costs

PARTICIPANTS TRAINING

Senior operational and engineering personnel involved in drilling / workover operations; OIMs, Drilling Superintendents, Drilling Engineers,

Jadwal Portal Cari Training 2024

 

  • batch 1 : 23 – 24 Januari 2024
  • batch 2 : 7 – 8 Februari 2024
  • batch 3 : 6 – 7 Maret 2024
  • batch 4 : 23 – 24 April 2024
  • batch 5 : 7 – 8 Mei 2024 || 21 – 22 Mei 2024
  • batch 6 : 11 – 12 Juni 2024
  • batch 7 : 17 – 18 Juli 2024
  • batch 8 : 21 – 22 Agustus 2024
  • batch 9 : 18 – 19 September 2024
  • batch 10 : 8 – 9 Oktober 2024 || 22 – 23 Oktober 2024
  • batch 11 : 5 – 6 November 2024 || 19 – 20 November 2024
  • batch 12 : 10 – 11 Desember 2024

Investasi dan Lokaspelatihan:

  • Yogyakarta
  • Jakarta
  • Bandung
  • Bali
  • Surabaya
  • Lombok

Catatan : Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Fasilitas :

  • FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara/Stasiun/Terminal)
  • Module / Handout
  • Flashdisk
  • Sertifikat
  • FREE Bag or bagpackers (Tas Training)
  • Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
  • 2xCoffe Break & 1 Lunch, Dinner
  • FREE Souvenir Exclusive
  • Training room full AC and Multimedia
Tanyakan pada kami ?

We are here to help you! Do not hesitate to ask us anything. Click below to start chat.

Marketing

Aini

Online

Marketing

Maulana

Online

Aini

Hai, ada yang dapat kami bantu ? 00.00

Maulana

Hai, tanyakan pada kami ? 00.00
мега даркнет